Manual Functional Testing with Multiple Interfaces Healthcare Client: USA
Manual Functional Testing with Multiple Interfaces Healthcare Client: USA
Client Challenge
Testing a complex USA based Healthcare system with Online data capture, audit trail features multiple device interfaces (touch screens, voice recorders, web cam, tablet PCs) etc.
Integration and System Testing for the multi layered, multi user, multi location application developed in dot net
Offshore model
Team size : 5
ZenTEST Labs Solution
Develop unit, integration & system test cases from 36 use cases
Testing entirely done at offshore with user simulation and using various device interfaces
Learnt the domain and involved Indian doctors as well for the same
Design scenario based tests for end to end functionality testing
Automate string testing using XML and QTP for loading data, test execution and result verification
Create Load Runner scripts to test the performance and scalability of the system
Tools Used:
Proprietary XML based testing framework using smart client architecture (online and offline)
QTP
Client Benefits
Defects detected earlier in development lifecycle
Lowered production support & application maintenance cost
Reduction in time spent by business users during UAT
Automated regression testing reduced application development time.
Manual Functional Testing with Infrastructure Management Client: Germany
Manual Functional Testing with Infrastructure Management Client: Germany
Client Challenge
Our Germany based client,
Had monthly releases for its Document Management System.
Testing was carried by their local computer graduates on adhoc basis. There was very limited documentation available for the project.
Insufficient testing resources.
Complex and multiple logical layers of the application.
Changing business requirements that shortened the testing cycle
Every small change in the application called for complete regression testing cycle that used to take more than 2 weeks.
ZenTEST Labs Solution
ZenTEST Labs brought on board a functional testing team with 2 dedicated offshore Team Members and every last week of the month 2 additional resources were deployed for the regression cycle on need basis.
Our team
Acquired application knowledge by leveraging our existing familiarity with similar applications
Created a Feature list document after exploring the application.
Created Test Scenarios for each feature in the list.
Maintained a pool of 4 resources for this project.
Client Benefits
By using industry standard best practices ZenTEST Labs established a requirements based test management plan.
We performed testing for each release and captured and reported defects and testing metrics for improvement.
Two people were dedicated for the project and remaining two people used to pitch in during the regression cycle only
The use of testing specialists and the pool concept reduced the testing regression cycle time from 2 weeks to one week and helped our client to meet their time and cost commitments.
Performance Testing with Healthcare Client: USA
Performance Testing with Healthcare Client: USA
Client Challenge
The application is a complex customizable information consolidation application
After developers complete each iteration, load and performance testing is done to isolate bottlenecks and identify performance improvement opportunities.
The firm wanted to lower costs without eliminating these value added services.
Requirements included:
The team needed to be able to interact with developers
To lower costs, the firm wanted a small offshore team, yet one that could respond quickly
ZenTEST Labs Solution
ZenTEST Labs proposed a solution which allowed the performance engineering effort to move quickly. Key activities included:
Transfer of knowledge via conference calls, and onsite coordinators
Built a comprehensive test script library
Planned and executed tests using Rational Robot results, and tracked performance bottlenecks
Produced reports, metrics and made comprehensive recommendations for improving application performance to meet specified requirements
Client Benefits
Key Points:
Built an efficient offshore testing model
Created Rational Robot and Rational Performance Tester based test scripts
Analyzed reports and identified crucial bottlenecks
Bug tracking and retesting till closure
Exceeded client expectations Technology: Rational Robot, Rational Performance Tester, Epicentric Portal, iPlanet, SiteMinder
Team Size: 3
Duration:
4 Iterations - 2 week each
Functional Automation with Leave & Attendance Management System
Client: India
Functional Automation with Leave & Attendance Management System
Client: India
Client Challenge
Our client's Product Development "Division" faced high post-production defects for one of their key products on Leave Management System. Since this was a customer-facing application, our client needed it to be bug-free. However, the development effort was bogged down with defects due to-
Insufficient testing resources
Extensive use of manual testing processes
Complex and multiple logical layers of the application
Changing business requirements that shortened the testing cycle.
ZenTEST Labs Solution
ZenTEST Labs automated the critical scenarios using WinRunner and TestDirector.
Precondition and Test Data was separated from script.
Test cases that required detailed verification of database and application were automated on high priority.
Client Benefits
The test execution cycle time was reduced without compromising the test coverage.
The entire test suite was easy to maintain, reusable and repeatable in every regression.
The same automation suite later helped Development team to perform unit level testing.
Minimize time to market for new features through functional and regression testing automation
Improve & quantify test coverage
Process Consulting Client: India
Process Consulting:
Client: CashTech, India.
Client Challenge
Company had just conducted their first ISO audit.
They had complied with several Process related requirements but were not able to actually derive a process frame work which would help them produce optimum performance which was sustained and monitor able.
Process implementation and execution rigor were more at a team level rather than at an organizational level.
Client needed to be assessed on capability and maturity for future decisions on certifications.
ZenTEST Labs Solution
ZenTEST Labs first decided to conduct an internal audit with key departments within the company to understand the present state of processes and the level of maturity and capability with respect to CMMI requirements.
ZenTEST Labs then made certain recommendation giving them a clear idea of state of processes and gaps to reach CMMI requirements. It also set a road map for implementing certain key processes which would help client reap immediate benefits. (GQM)
Client Benefits
The Client understood clearly their present state of processes.
It also understood Gaps which needed to be plugged for creating a process frame work which would be responsible for optimum performance.
It helped them to understand areas if immediately worked on at a small consideration would reap the client immediate benefits.
It got a road map for process maturity and capability which would help them get audited for higher process certifications.
Manual Functional Testing with eLearning Client: India
Manual Functional Testing with eLearning Client: India
Client Challenge
Our client, one of the largest e-learning solution provider,
Faced high post-production defects for one of their key product i.e. a Learning Management System to teach Preach tree accounting software.
Testing was carried by their internal testing team which was insufficient.
There was very limited documentation available for the project.
The application was a platform to host e-learning contents with complex and multiple navigations.
Client wanted to carry out configuration testing on various OS and anti viruses
ZenTEST Labs Solution
ZenTEST Labs brought on board a functional testing team with 2 dedicated offshore Team Members and 2 additional resources were deployed for execution on need basis.
Our team
Quickly acquired the application knowledge.
Created a Feature list document after exploring the application.
Created Test Scenarios for each feature in the list.
Maintained a pool of 2 resources for this project.
Carried out configuration testing on 2 operating systems (Windows 2K and XP) and 2 anti viruses (MacAfee and Deep freeze).
Client Benefits
By using industry standard best practices ZenTEST Labs established a requirements based test management plan.
We performed testing for the release and captured and reported defects in a very short span of a week.
The testing cycle time was reduced to one week without compromising quality.
The testing services helped our client to meet their time and cost commitments.